Resume Alignment Implementation Plan
Resume Alignment Implementation Plan
For agentic workers: REQUIRED SUB-SKILL: Use superpowers:subagent-driven-development (recommended) or superpowers:executing-plans to implement this plan task-by-task. Steps use checkbox (
- [ ]) syntax for tracking.
Goal: Align the public homepage dates and selected projects with Daniel’s latest approved resume details.
Architecture: Make targeted Markdown content edits in the existing Jekyll pages. Preserve unpublished research, the downloadable PDF, site structure, and all unrelated entries.
Tech Stack: Jekyll, Markdown, HTML, Bundler
Task 1: Align public homepage dates
Files:
Modify:
_pages/about.mdStep 1: Confirm the old public values exist
Run: rg -n "December 2027|Sep\. 2026 - Dec\. 2027|Jan\. 2026 - Mar\. 2026|Mar\. 2025 - Sep\. 2025|Sep\. 2022 - Dec\. 2025" _pages/about.md
Expected: all five old values are present before editing.
- Step 2: Apply the approved replacements
Replace the five values with January 2028, Aug. 2026 - Jan. 2028, Dec. 2025 - Mar. 2026, Jun. 2025 - Sep. 2025, and Sep. 2022 - Jan. 2026 respectively. Do not edit the Georgia Tech or NYU research entries.
- Step 3: Verify homepage values
Run: rg -n "January 2028|Aug\. 2026 - Jan\. 2028|Dec\. 2025 - Mar\. 2026|Jun\. 2025 - Sep\. 2025|Sep\. 2022 - Jan\. 2026" _pages/about.md
Expected: all five approved values are present.
Task 2: Align selected projects
Files:
Modify:
_pages/projects.mdStep 1: Replace Qwopus and add the two latest projects
Use these three entries at the top of Selected Projects:
- **Qwopus-Reasoning**: Post-trained Qwen through SFT on reasoning and math data, followed by GRPO with custom rewards and MTP integration; improved GPQA-Diamond accuracy by 6% and inference throughput by 11% over the base model.
- **AgenticRL-Long Horizon Coding Agent**: Post-trained Qwen3.5-4B with GSPO on multi-turn coding trajectories using execution-verified terminal rewards, improving single-rollout task success by 7% and pass@5 by 9% over the base model.
- **Tiny OneRec**: Built an LLM-based generative recommender by quantizing item text embeddings into Semantic IDs with an RQ-VAE and post-training Qwen through multi-task SFT for alignment and GRPO with constrained decoding and rank-aware rewards; achieved an HR@10 of 14.3% and an NDCG@10 of 10.4% on the Amazon Reviews Office Products dataset.
- Step 2: Verify project metrics and retention
Run: rg -n "GPQA-Diamond accuracy by 6%|throughput by 11%|AgenticRL-Long Horizon Coding Agent|single-rollout task success by 7%|Tiny OneRec|HR@10 of 14\.3%|LLaMA 3\.2-Vision" _pages/projects.md
Expected: all new metrics and one retained existing project are present.
Task 3: Validate the completed change
Files:
- Verify:
_pages/about.md Verify:
_pages/projects.md- Step 1: Run the site build
Run: bundle exec jekyll build
Expected: Jekyll exits successfully without content or Liquid errors.
- Step 2: Inspect the final diff
Run: git diff --check and git diff -- _pages/about.md _pages/projects.md
Expected: no whitespace errors; only the approved public content changes appear.
- Step 3: Commit the implementation
git add _pages/about.md _pages/projects.md docs/superpowers/plans/2026-09-02-resume-alignment.md
git commit -m "Align website content with latest resume"